12/19/2010
This mornings forecast is spot again and the breeze is up so we are sailing with A2 up and full main 13 to 14 knots of boat speed, I have briefed the guys to sock the kite if there is squalls and let them go through and we can re hoist once the breeze has settled.
Read more … log entry Day 13 (arrival!!!)
12/16/2010
Motoring through the night again, with single man watches and not much shipping or weather to talk of, at 0400 I was awoken by the B&G alarm. Daz was resetting the B&G’s as there was a fault code on the pilot, he narrowed it to the valve block in the lazerette and within an hour it was back up and running.
Read more … log entry day 12 ( the clean up)